Skip to content

Installation Overview

This section provides a comprehensive guide to installing the FullShop Gen 3 system. The installation process is divided into several key components:

  • Infrastructure Plumbing: Base plumbing requirements and setup
  • Digital Feed Unit: Installation and configuration of the DFU
  • Sensor Valve Interface: SVI installation and connections
  • Bucket Fill Station: Setting up the bucket fill station
  • SVI Identity Switch: Configuration of SVI identity switches

Each component has its own detailed installation guide in the subsequent sections.

Overview Video

FullShop Installation Overview Diagram