Installation Overview
This section provides a comprehensive guide to installing the FullShop Gen 3 system. The installation process is divided into several key components:
- Infrastructure Plumbing: Base plumbing requirements and setup
- Digital Feed Unit: Installation and configuration of the DFU
- Sensor Valve Interface: SVI installation and connections
- Bucket Fill Station: Setting up the bucket fill station
- SVI Identity Switch: Configuration of SVI identity switches
Each component has its own detailed installation guide in the subsequent sections.